Factory Steel Structure 20FT Portable Cabin Space Saving Affordable Folding Emergency Housing

Customization: Available
Application: Office
Fast Installation: Fast Installation

Product Description

Overview - Basic Info

Model NO.
F-06
Feature
Earthquake Resistant, Easily Movable, Eco-Friendliness, Flexibly Combinable, Leak Proof, Moisture Proof, Safe, Thermal Insulation, Waterproof, Wind Resistance
Material
Steel Structure+Sandwich Panel
Usage
Villa, Dormitories, Temporary Offices
Certification
ISO, CE, SGS
Length
5.8m
Width
2.5m
Height
2.6m
Steel Structure Thickness
3.5mm
Roof/Wall Thickness
40mm
Production Capacity
800 Sets Per Month

Product Description

Customized Color Steel Structure Shipping Folding Container House
Fast Installation 4 minutes install one house, significantly saving labor costs.
Durable Structure Each side has 5 galvanized hinges to ensure overall stress distribution.
Waterproof Design Special roof design provides excellent waterproof performance.
Turnkey Solution Comes complete with wall, roof, electrics, and floor.
Folding Container House Feature

Applications

Folding Container House Applications

Visual Showcase

Structure Detail
Production View
FAQ and Details

Frequently Asked Questions

How long does it take to install one folding container house?
The installation is extremely fast; it takes only about 4 minutes for one house with standard tools and labor.
Is the house resistant to natural disasters?
Yes, the steel structure design is earthquake resistant and wind resistant, ensuring safety in various environments.
What is the waterproof performance of the roof?
The house features a specialized roof design with high-quality sealing to provide excellent leak-proof and waterproof performance.
Does the unit come with flooring and electricity?
Yes, each unit comes complete with the wall panels, roof, integrated electrical system, and flooring ready for use.
Can multiple units be combined?
Yes, the houses are flexibly combinable, allowing you to create larger spaces for dormitories or temporary offices.
What materials are used in the construction?
The main frame is made of high-strength steel structure (3.5mm thickness) and high-density sandwich panels for thermal insulation.

Related Products